NY I-678 Bridge Replacement

Our client asked us to design and provide a sixteen point Synchronous Jacking System to both raise and remove the existing bridges spanning over the I-678. The existing bridges were placed on a set of rollers and pushed off to the side so that it could be demolished and taken...

WB Equipment Corp.