NY I-678 Bridge Replacement

January 21, 2019

Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.

Our client had asked to design and provide a sixteen point Synchronous Jacking System to both rain and remove the existing bridges spanning over the I678.

Then the existing bridges placed on a set of rollers and pushed off to the side so that it could be demolished and taken away, using the same sixteen point Synchronous Jacking System.

Then the existing bridges placed on a set of rollers and pushed

to the side so that it could be demolished and taken away, using the same sixteen point Synchronous Jacking System.

The new bridge was then placed on rollers and rolled into positioning then using the Synchronous Jacking System was lowered into place.
This was done for both bridges on I 678. The Jamaica Avenue bridge and Hillside Avenue bridge job was a big success. See the letter from the client.

I-678 Bridge Roll-in & Replacement

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.

Description of Project Scope of Bridge Work – – Remove entire superstructure – 110 feet long – Remove and relocate abutments – Remove and replace center pier stem – Install new two-span continuous bridge – 28 feet longer than existing Scope of Work on Van Wyck Expressway (I-678) – – Widen segment by addition of acceleration/deceleration lanes in both directions – Improve safety of VWE with full width flush shoulders – Resurface all six lanes over a half mile in length – Upgrades to drainage, lighting, ITS, signing, landscaping.

Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
















MORE NEWS & PROJECTS

WHIN Music Community Charter School

Press & PR

WHIN Music Community Charter School

March 7, 2024

“Using two simultaneous jacking systems located at each of the four corners of the building (one in each corner), a 120-ton simultaneous jacking system is used to lift

READ MORE →
WB Equipment News

Press & PR

New WB Equipment Website

December 30, 2023

The new corporate website also showcases WB Equipment Corp.’s dedication to safety and expertise. Clients can easily access detailed information about advanced safety features, such as velocity fuses

READ MORE →

Custom Engineered Jacking Systems · Jacking · Roads & Bridges · Synchronous Lifting Systems

Hampton Roads Transportation Accountability Commission (HRTAC)

May 16, 2022

Custom hydraulic system consisting of (4) 150 ton 36 inch stroke pull cylinders that was designed and supplied to launch crane onto a barge on the Elizabeth River.

READ MORE →
REQUEST A QUOTE NOW!