{"id":57,"date":"2019-01-21T09:01:00","date_gmt":"2019-01-21T09:01:00","guid":{"rendered":"https:\/\/demo.crocoblock.com\/powedris\/?p=57"},"modified":"2021-07-13T17:10:13","modified_gmt":"2021-07-13T17:10:13","slug":"ny-i-678-bridge-replacement","status":"publish","type":"post","link":"https:\/\/wbequipment-news.com\/ny-i-678-bridge-replacement\/","title":{"rendered":"NY I-678 Bridge Replacement"},"content":{"rendered":"

\"\"<\/a>Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in\/Roll Out Method.<\/p>\n

\"\"<\/a><\/p>\n


\n

Our client had asked to design and provide a sixteen point Synchronous Jacking System to both rain and remove the existing bridges spanning over the I678.<\/strong><\/em><\/p>\n

Then the existing bridges placed on a set of rollers and pushed off to the side so that it could be demolished and taken away, using the same sixteen point Synchronous Jacking System.<\/strong><\/em><\/p>\n

Then the existing bridges placed on a set of rollers and pushed<\/strong><\/em><\/p>\n

to the side so that it could be demolished and taken away, using the same sixteen point Synchronous Jacking System.<\/strong><\/em><\/p>\n

The new bridge was then placed on rollers and rolled into positioning then using the Synchronous Jacking System was lowered into place.<\/strong><\/em>
\nThis was done for both bridges on I 678. The Jamaica Avenue bridge and Hillside Avenue bridge job was a big success. See the letter from the client.<\/strong><\/em><\/p>\n

\"\"<\/a><\/p>\n

I-678 Bridge Roll-in & Replacement<\/h3>\n

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in\/Roll Out Method.<\/p>\n

Description of Project Scope of Bridge Work \u2013 \u2013 Remove entire superstructure \u2013 110 feet long \u2013 Remove and relocate abutments \u2013 Remove and replace center pier stem \u2013 Install new two-span continuous bridge \u2013 28 feet longer than existing Scope of Work on Van Wyck Expressway (I-678) \u2013 \u2013 Widen segment by addition of acceleration\/deceleration lanes in both directions \u2013 Improve safety of VWE with full width flush shoulders \u2013 Resurface all six lanes over a half mile in length \u2013 Upgrades to drainage, lighting, ITS, signing, landscaping.<\/p>\n

\"\"<\/p>\n

Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in\/Roll Out Method.<\/p>\n


\n<\/a>
\n

\n<\/a>
\n

\n<\/a>
\n

\n<\/a>
\n

\n<\/a>
\n

\n<\/a>
\n

\n<\/a>
\n

\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"

Our client asked us to design and provide a sixteen point Synchronous Jacking System to both raise and remove the existing bridges spanning over the I-678. The existing bridges were placed on a set of rollers and pushed off to the side so that it could be demolished and taken away, using the same sixteen point Synchronous Jacking System.<\/p>\n","protected":false},"author":4,"featured_media":1382,"comment_status":"open","ping_status":"open","sticky":false,"template":"post-templates\/single-layout-3.php","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[],"_links":{"self":[{"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/posts\/57"}],"collection":[{"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/comments?post=57"}],"version-history":[{"count":20,"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/posts\/57\/revisions"}],"predecessor-version":[{"id":2952,"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/posts\/57\/revisions\/2952"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/media\/1382"}],"wp:attachment":[{"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/media?parent=57"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/categories?post=57"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wbequipment-news.com\/wp-json\/wp\/v2\/tags?post=57"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}